St Mary’s College

Project requirement

Tanking to footings and precast panel retaining walls, lift pit and storage areas, plaza deck, roof and gutters

Solution

RCG specified Volclay tanking due to the quality of the product and the QA service that we provide. It gave the architect confidence and the peace of mind that the product was going to work and that we cared about providing the client with a dry basement and not just selling the product. We also provided a detailed design around the transition between tanking and plaza deck where floating tiles were installed over a double layer torch-on membrane.

Project details  St Marys College

Applicator: MPM Waterproofing Services Ltd
Builder: Robert Cunningham Construction
Architect: RCG
Completed: May 2014

Products:

Project Size: Volclay 800m², Casali 500m²
QA Visits: 10
Warranty: Volclay full system warranty, 20 years
Hydrostatic head of pressure: 20m