Above Ground

Rose Garden Apartments


Rose Garden Apartments Project Requirements  The apartments demonstrated some interesting aspects, Including a tunnel design with waterproofing on both sides.  Industry Sector Residential apartments Solution Allco's Volclay Voltex was installed alongside Waterstop RX-101-T, roofing waterproofing was using Casali Cool Roof Solution.  Project Details Project Name: Rose Garden Apartments Architect: Context Architects Ltd  Products Used: Casali Dermabit Extra, Volclay Voltex, Waterstop RX-101-T Completed: Volclay - November 2014, Casali - July 2017 The Project  Project Requirement The Rose Garden Apartments, located at the heart of Auckland's North Shore, is an 800-apartment complex including a large basement garage.   Our TA team worked closely alongside CMP Construction, conducting several site visits each month, during construction. Their communication made working...

MacMurray Medical Centre


MacMurray Medical Centre Project Requirements This cutting-edge private medical centre required a high level waterproofing solution. Industry Sector Health Solution Allco’s Volclay Voltex was installed to the building on walls, footings, under slabs and lift pits in combination with our Allsheet 500 DPM and Waterstop RX. Project Details Project Name: MacMurray Medical Centre Applicator: CCR Waterproofing Builder: Argon Construction Architect: Warren & Mahoney Products Used: Casali Dermabit Extra, Volclay Voltex Completed: December 2019 The Project  PROJECT REQUIREMENT This cutting-edge private medical centre located in the Auckland suburb of Remuera was beautifully designed by Warren & Mahoney Architects to provide a relaxing patient experience, from the consultation suites to the operating rooms and recovery rooms. ALLCO SOLUTION Our waterproofing membranes were the...

Crest Apartments


Crest Apartments Project Requirements Combination commercial space, townhouses and 5 levels apartment tower required a robust system of waterproofing. Industry Sector Residential apartments Solution Casali two layer torch-on membrane was installed on the apartment roof. Project Details Project Name: Crest Apartments Applicator: Sahara Waterproofing NZ LTD Architect: Paul Brown & Associates Architects Builder: Ganellen Construction Products Used: Casali Dermafill and Dermabit Extra, Hydrotech Completed: February 2019 The Project  Project Requirement The mix development of commercial space, townhouses and 5 levels apartment tower required a robust system of waterproofing for exposed to rain areas at both ground retail level and elevated apartment tower balconies. Apart from a waterproofing system required for the pitched roof of the apartment...

Cavalli Apartments


Cavalli Apartments Project Requirements Cavalli Apartments consists of two partially shared basement, private carparking, a café and shared lounge. Industry Sector Residential apartments Solution Allco membranes were the preferred choices for the apartments below and above ground waterproofing with Volclay and JM TPO as the preferred choices for the project Project Details Project Name: Cavalli Apartments Applicator: Accurate Waterproofing Products Used: Volclay Voltex, TPO Completed: November 2017   The Project  Located only a short walk from Long Bay Beach, the Cavalli Apartments consists of two parts - the 5 level Beach Building & 4 Level Cavalli Building on a partially shared basement, private carparking, a café and shared lounge. Project Requirement Basement parking area accessible...

Campbells Bay Early Learning Centre & Extension


Campbells Bay Early Learning Centre & Extension Project Requirements To create a beautifully crafted and engaging space for young children to play in. Industry Sector Education Solution Allco Waterproofing Solutions designed, supplied the semi-circular Green Roofing System Project Details Project Name: Campbells Bay Early Learning Centre & Extension Builder: 505 Construction Architect: Collingridge and Smith Architects (UK) Ltd Products Used: TPO,  Green Roof System, Volclay Product Range Completed: March 2022 The Project  PROJECT REQUIREMENTS When Adrian Rowan, from award-winning Auckland building business 505 Construction wanted to create a beautifully crafted and engaging space for young children to play in, he sought out Allco Waterproofing Solutions to supply crucial waterproofing systems and to input expertise. Building Campbells Bay...

ASB Building – North Wharf


ASB Building - North Wharf Project Requirements Commercial building on Auckland's waterfront requiring a waterproofing solution. Industry Sector Commercial Solution Casali features across the roof expanse of buildings 22 and 23, including in roof gutters on external balconies and beneath timber decking. Project Details Project Name: ASB Building - North Wharf Applicator: MPM Waterproofing Ltd Architect: Bligh Voller Nield Architecture (BNV) in association with Jasmax Ltd Builder: Fletchers Construction Ltd Products: Casali Dermabit Extra Torch On, Volclay Swelltite, Volclay Voltex SWR Completed: October 2011 The Project  PROJECT REQUIREMENT Casali features across the roof expanse of buildings 22 and 23, including in roof gutters on external balconies and beneath timber decking. It is used in the landscaped area and...