Below Ground

Kings College Performing Arts Centre


Kings College Performing Arts Centre Project Requirements Robust waterproofing for Toi Manawa, the brand-new Performing Arts Centre at King’s College. Industry Sector Education Solution The combination of Coreflex, Volclay and Casali ensured a complete and cohesive waterproofing solution for this project. Project Details Project Name: Kings College Performing Arts Centre Applicator: CCR Waterproofing Architect: Patterson Associates Ltd Main Contractor: Aspec Construction Products Used: Coreflex, Volclay Range and Casali Torch On Completed: March 2024 The Project  Project Overview:   Toi Manawa, the brand-new Performing Arts Centre at King’s College encompasses the school’s values for the best all-round education while endorsing existing programmes and introducing new art forms to the students. The centre includes a specialist theatre that features sound, lighting...

Kaipātiki Road Kāinga Ora Apartments


Kaipātiki Road Kāinga Ora Apartments Project Requirements The Kāinga Ora redevelopment required robust waterproofing solutions for below ground, balconies and planters. Industry Sector Apartments Solution The Volclay waterproofing system and the Casali range was used to ensure a complete and cohesive waterproofing solution. Project Details Project Name: Kaipātiki Road Kāinga Ora Apartments Applicator: MPM Waterproofing Architect: Ministry of Architecture + Interiors (MOAI) Products Used: Cetco Volclay Range and Casali Torch On Completed: August 2023 The Project  Project Overview:   The Kāinga Ora redevelopment of 13-15 Kaipātiki Road transformed the site from 4 homes into a modern complex of 34 apartments within the 5-storey block.  Challenges:   The development required robust waterproofing solutions for below ground, balconies and planters. The site...

Baradene College Gymnasium


Baradene College Gymnasium Project Requirements A robust waterproofing system to ensure a weathertight gymnasium for present and future Baradene students. Industry Sector Education Solution The Volclay waterproofing system was the ideal choice for waterproofing this project with Allsheet 500 Damp Proof Membrane (DPM) used for the low-risk areas. Project Details Project Name: Baradene College Gymnasium Applicator: Elephant NZ Ltd Architect: Jasmax Products Used: Cetco Volclay Range and Allsheet 500 DPM Completed: June 2024 The Project  Project Overview:   Designed by Jasmax Architects, the Baradene College Gymnasium, offers top-notch sports and educational facilities to accommodate the expanding student body. The new complex features a double gym making it suitable for major indoor sports events and inter-school games....

Edition Apartments


Edition Apartments Project Requirements The Edition Apartments is a residential development located in Parnell, Auckland with 19 apartments. Industry Sector Apartments Solution The Volclay system was used for below ground waterproofing and the Casali range was used for the roof and balconies. Project Details Project Name: Edition Apartments  Applicator: CCR Waterproofing Architect: Monk MacKenzie Products Used: Cetco Volclay Range and Casali Torch-On membrane Completed: 2023 The Project  Project Overview:   The Edition Apartments is a residential development located in Parnell, Auckland with 19 apartments. The building comprises of two carpark levels below street grade with the three upper levels cantilevered above the ground floor, retaining breathtaking views of the harbour beyond.  Challenges:   A large challenge with this project was...

Auckland Grammar School Library


Auckland Grammar School Library Project Requirements The Auckland Grammar School Library required a robust and watertight tanking solution to withstand the physical demands of the site and ensure structural longevity Industry Sector Education Solution Allco utilised its Volclay tanking range, known for its self-healing and self-sealing properties for this project. Project Details Project Name: Auckland Grammar School Library Builder: Aspec Construction Architect: Jasmax Products Used: Voltex and Swelltite. Completed: July 2023 The Project  Project Overview:   The new Te Ara Mātauranga library at Auckland Grammar School, a beacon of academic resources, opened its doors in October 2023. Meaning "pathway to knowledge" in Te Reo Māori, the library spans two levels featuring extensive fiction and non-fiction collections, two...

University of Auckland Social Sciences Building (B201)


University of Auckland Social Sciences Building (B201)  Project Requirements The University of Auckland embarked on a transformative refurbishment of the 50-year-old Social Sciences Building (B201). Industry Sector Education Solution Allco’s complete tanking range was the ideal solution for this sophisticated project.  Project Details Project Name: University of Auckland Social Sciences Building (B201) Builder: Hawkins Architect: Jasmax Products Used: Voltex and Swelltite. Completed: February 2024 The Project  Project Overview:  The University of Auckland embarked on a transformative refurbishment of the 50-year-old Social Sciences Building (B201), enhancing it into a future-ready, environmentally sustainable facility. By opting for refurbishment over demolition, the university significantly reduced its carbon footprint and shortened the construction timeline, achieving a 6 Green Star...