Product

Auckland Central Library


Auckland Central Library Project Requirements This project required the refurbishment of existing concrete flat-roof as part of its maintenance plan to preserve the building.   Industry Sector Commercial Solution Allco's Hydrotech MM6125 and Casali Torch On. Project Details Project Name: Auckland Central Library Applicator: Sansom Construction Systems Architect: Babbage Consultants Limited Products Used: Hydrotech MM6125, Casali Torch On Membrane Completed: December 2021 The Project  Project Requirement: To refurbish and waterproof the existing roof in order to preserve the building, its heritage and its contents for years to come. Removal of the existing old membranes from the main roof area including parapets and skylights structures, application of new waterproofing systems suitable for the development of a...

Rangitoto Avenue House


Rangitoto Avenue House Project Requirements Residential property requiring a roofing membrane solution. Industry Sector Residential Solution Allco's Casali Range Project Details Project Name: Rangitoto Avenue House Applicator: MPM Waterproofing Architect: Ninety 45 Products Used: Casali Torch On Completed: October 2010 The Project  Remuera House is a stunning residential property located in the Auckland suburb of Remuera. Ninety45 have undertaken the design and build of this modern, split-level house. Allco’s Casali Torch On Membrane was the preferred choice for the roofing solution, in combination with Allco’s pop-up roof ventilation systems.  

Mahuika House


Mahuika House Project Requirements Residential Property mitigating challenges of dense native bush and the existing stream. Industry Sector Residential Solution Allco's Volclay Range Project Details Project Name: Mahuika House Applicator: MPM Waterproofing Builder: Lindesay Construction Ltd Products Used: Volclay Voltex, Volclay Swelltite  Completed: February 2021 The Project  Located on scenic Waiheke Island, this phenomenal project was designed by Daniel Marshall Architects. The house was built alongside the ridge-line in parallel to the coast, stepping down in a total of 4 levels with the swimming pool under the main pavilion; parallel to the stream. Named Mahuika House after the Māori Goddess of Fire following an accidental fire that tore through the house, destroying the two upper pavilions...

Massey University – Albany Campus


Massey University - Albany Campus Project Requirements New build extention requiring tanking membrane. Industry Sector Education Solution Allco's Volclay Range Project Details Project Name: Massey University– Albany East Applicator: Elephant NZ  Architect: Opus Architecture Products Used: Volclay Voltex Completed: December 2009 The Project  Massey University is an iconic landmark located in the heart of Auckland’s North Shore. “Project ran really smoothly, good communication across architects, builders, applicators and the Allco Team” – Adrian Crow TA Specialist Allco’s Tanking product range was the preferred option for this new build. Large Retaining wall located on the southside utilised Volclay’s Voltex just short of a full encapsulation.

Bethlehem Medical Centre


Bethlehem Medical Centre Project Requirements Medical Facility requiring a tanking solution Industry Sector Health Solution Allco's Volclay Range Project Details Project Name: Bethlehem Medical Centre Architect: Shane Rawse Products Used: Volclay Product Range Completed: February 2014 The Project  Bethlehem Medical Centre located in the heart of Tauranga provides healthcare services to the local community. PROJECT REQUIREMENT A new build medical centre requiring a tanking solution. ALLCO SOLUTION The tanking installation of this project included Allco’s Volclay range which was used across lift pits, footings, and penetrations, with Voltex, installed onto precast panels in combination with Waterstop RX101T and RX102.

Scott Point Primary School


Scott Point Primary School Project Requirements Scott Point Primary School was a full new build, requiring a full tanking system. Industry Sector Education Solution Allco's Volclay Range Project Details Project Name: Scott Point Primary School Applicator: MPM Waterproofing Services  Builder: Hawkins Construction Ltd  Architect: Ignite Architects Ltd  Products Used: Volclay Voltex, Waterstop RX101T, Volclay Swelltite, Bentoseal, Cetcoat, Waterstoppage Completed: March 2021 The Project  Located in the beautiful suburb of Hobsonville, Scott Point Primary School serves the growing communities of Hobsonville and Scott Point. Designed by Ignite Architects the modern school includes over 1000m2 of open plan teaching spaces, amenities for staff and students, an administration block, lunchroom area for staff, along with car parking, drop off/pick up...