Product

Kathleen Kilgour Centre – Tauranga Hospital


Kathleen Kilgour Centre – Tauranga Hospital Project Requirements The sensitive nature of the medical equipment required a high level of waterproofing Industry Sector Health Solution Voltex tanking at the bunker and lift pits Project Details Project Name: Kathleen Kilgour Centre- Tauranga Hospital Applicator: Bay Protective Coatings Builder: Fletchers Construction Architect: Wingate + Farquhar Architects   Products Used: Volclay Voltex  Completed: June 2010 The Project  The Kathleen Kilgour Centre, located at Tauranga Hospital, providing radiation treatments. Wingate + Farquhar Architects designed this stunning three-level project, and Allco Applicators Bay Protective Coatings carried out the waterproofing in collaboration with Fletcher Construction. PROJECT REQUIREMENT The building has a slab-on-grade floor with a bunker at 4.5 m deep and a lift pit. Sidewalls were...

Harewood Underpass


Harewood Underpass Project Requirements The brief was durability for the life of the structure Industry Sector Infrastructure Solution A requirement to be leak free to maintain the integrity of both the profiled panel façades and the Architectural Coating. Project Details Project Name: Harewood Underpass Applicator: Absolute Waterproofing Products Used: Volclay product range Completed: June 2016 The Project  Project Overview:  The Harewood Underpass is a pivotal infrastructure development located at the intersection of Russley and Harewood Roads in Christchurch. This 80-meter enclosed section facilitates pedestrian and cyclist movement and enhances safety en route to the expanding Christchurch International Airport precinct.  Challenges:  The primary requirement for the underpass was to achieve robust, long-lasting waterproofing to preserve the integrity...

Fonterra’s HQ Building


Fonterra’s HQ Building Project Requirements New Zealand dairy company Fonterra’s HQ building in Auckland’s CBD is a landmark building. Industry Sector Commercial Solution Allco’s Volclay product range for this tanking project. Project Details Project Name: Fonterra HQ Building Applicator: Mohan Waterproofing Builder: Fletcher Construction Architect: Jasmax Products Used: Volclay Swelltite, Volclay Voltex, Waterstop RX 102, Bentoseal Completed: January 2016 The Project  PROJECT REQUIREMENT  New Zealand dairy company Fonterra’s HQ building in Auckland’s CBD is a landmark building demonstrating Jasmax’s cutting edge architectural designs, with the tanking being installed by Allco approved applicator Mohan Waterproofing. ALLCO SOLUTION The project completed in 2016 utilised Allco’s Volclay product range for this tanking project. Driven sheet piles on grade allowed for excavation...

Crest Apartments


Crest Apartments Project Requirements Combination commercial space, townhouses and 5 levels apartment tower required a robust system of waterproofing. Industry Sector Residential apartments Solution Casali two layer torch-on membrane was installed on the apartment roof. Project Details Project Name: Crest Apartments Applicator: Sahara Waterproofing NZ LTD Architect: Paul Brown & Associates Architects Builder: Ganellen Construction Products Used: Casali Dermafill and Dermabit Extra, Hydrotech Completed: February 2019 The Project  Project Requirement The mix development of commercial space, townhouses and 5 levels apartment tower required a robust system of waterproofing for exposed to rain areas at both ground retail level and elevated apartment tower balconies. Apart from a waterproofing system required for the pitched roof of the apartment...

Cavalli Apartments


Cavalli Apartments Project Requirements Cavalli Apartments consists of two partially shared basement, private carparking, a café and shared lounge. Industry Sector Residential apartments Solution Allco membranes were the preferred choices for the apartments below and above ground waterproofing with Volclay and JM TPO as the preferred choices for the project Project Details Project Name: Cavalli Apartments Applicator: Accurate Waterproofing Products Used: Volclay Voltex, TPO Completed: November 2017   The Project  Located only a short walk from Long Bay Beach, the Cavalli Apartments consists of two parts - the 5 level Beach Building & 4 Level Cavalli Building on a partially shared basement, private carparking, a café and shared lounge. Project Requirement Basement parking area accessible...

Campbells Bay School Extension


Campbells Bay School Extension Project Requirements New standalone classroom block including a two story large external staircase requiring a tanking solution. Industry Sector Education Solution The full Allco Volclay range was chosen for this project due to its versatility and ease of installation. Project Details Project Name: Campbells Bay School Extension Applicator: MPM Waterproofing Builder: Woodview Construction Products Used: Volclay Voltex, Volclay Swelltite, Allsheet 500DPM Completed: May 2022 The Project  Campbells Bay Primary School located on Auckland’s North Shore began building their new standalone classroom block in 2021. This new block includes 14 classrooms, bike shed and play space and will remove the need for temporary classrooms on the school field. PROJECT REQUIREMENT  The new standalone...