Sector

University of Auckland Social Sciences Building (B201)


University of Auckland Social Sciences Building (B201)  Project Requirements The University of Auckland embarked on a transformative refurbishment of the 50-year-old Social Sciences Building (B201). Industry Sector Education Solution Allco’s complete tanking range was the ideal solution for this sophisticated project.  Project Details Project Name: University of Auckland Social Sciences Building (B201) Builder: Hawkins Architect: Jasmax Products Used: Voltex and Swelltite. Completed: February 2024 The Project  Project Overview:  The University of Auckland embarked on a transformative refurbishment of the 50-year-old Social Sciences Building (B201), enhancing it into a future-ready, environmentally sustainable facility. By opting for refurbishment over demolition, the university significantly reduced its carbon footprint and shortened the construction timeline, achieving a 6 Green Star...

139 Greys Ave – Te Mātāwai Kaianga Ora Project


139 Greys Ave - Te Mātāwai Kaianga Ora Project Project Requirements Te Mātāwai is a pivotal residential development in the heart of Auckland CBD, part of Kāinga Ora redevelopment. Industry Sector Apartments Solution The Volclay waterproofing system was chosen for its versatility and effectiveness across various applications. Project Details Project Name: 139 Greys Ave - Te Mātāwai Kaianga Ora Project Builder: Icon Construction Architect: Mode Design Corp Products Used: Voltex, Swelltite and Hydrotech Completed: June 2023 The Project  Project Overview:  Te Mātāwai is a pivotal residential development in the heart of Auckland CBD, part of Kāinga Ora redevelopment. The project transformed the site from an existing 87-unit building into a modern complex of 276 apartments,...

Pito-One to Melling Underpasses


Pito-One to Melling Underpasses Project Requirements A robust and resilient solution for the underpasses of the Pito-One (Petone) to Melling section of Te Ara Tupua. Industry Sector Infrastructure Solution Allco’s complete tanking range was the ideal solution for this vast project.  Project Details Project Name: Pito-One to Melling Underpasses Builder: Fulton Hogan Civil South Architect: Isthmus Group Products Used: Voltex and Swelltite. Completed: October 2023 The Project  Te Ara Tupua is a walking and cycling link to improve transport options between Wellington and Lower Hutt, providing an efficient and attractive choice for commuters. It will deliver a safe, connected and resilient route, enabling more people to walk or bike, and connect with local paths...

NZ Blood Donor Centre Hamilton


NZ Blood Donor Centre Hamilton Project Requirements New NZ Blood Donor Centre requiring a comprehensive tanking solution for its 2 level basement. Industry Sector Health Solution Allco’s complete Volclay product range was chosen for this project. Project Details Project Name: NZ Blood Donor Centre Hamilton Builder: Naylor Love Architect: Edwards White Products Used: Voltex and Swelltite. Completed: July 2023 The Project  The new NZ Blood Donor Centre has been purpose-built to cater to the growing demands and needs of the Waikato region. Based in the heart of Hamilton, the new building offers 24 donor beds, 30 underground parking spaces and is also the base of the NZ Blood national office. A key consideration NZ Blood...

Two Trees Luxury Boutique Lodge


Two Trees Luxury Boutique Lodge Project Requirements The multibuilding project required a below ground solution and a range of different roofing solutions across multiple different substrates.  Industry Sector Residential Solution Allco supplied the below ground tanking solution and a combination of cold and warm roof build ups.   Project Details Project Name:Two Trees Taupo Builder: Haimes Building Architect: JT Design Architecture Products Used: ALLTHERM Warm Roof, JM TPO, Swelltite and Aquadrain. Completed: May 2023 The Project  Two Trees consists of an architecturally designed house with a detached garage, four guest pavilions and a reception building that will operate as a luxury lodge. The stunning 900sqm home designed by JT Design Architecture Ltd is situated...

The Grove


The Grove Project Requirements The project required a comprehensive tanking solution withstanding hydrostatic conditions and saltwater contamination. Industry Sector Aged Care Solution Allco’s Voltex SWR was the perfect solution for the salinated site. Project Details Project Name: The Grove Builder: Kalmar Construction Architect: Pacific Environments Products Used: Volclay Range & Accessories  Completed: October 2019 The Project  The Grove was a new build Retirement Village located just minutes from Orewa Beach. The 76-apartment village was built to meet the growing demand of one of North Auckland’s most sought-after suburbs. PROJECT REQUIREMENT  This beautiful village required a comprehensive basement tanking solution that would withstand the hydrostatic conditions. Pre-construction site water tests indicated slight salination at the site...