ASB Building – North Wharf
Project Requirements
Commercial building on Auckland’s waterfront requiring a waterproofing solution.
Industry Sector
Commercial
Solution
Casali features across the roof expanse of buildings 22 and 23, including in roof gutters on external balconies and beneath timber decking.
Project Details
Project Name: ASB Building – North Wharf
Applicator: MPM Waterproofing Ltd
Architect: Bligh Voller Nield Architecture (BNV) in association with Jasmax Ltd
Builder: Fletchers Construction Ltd
Products: Casali Dermabit Extra Torch On, Volclay Swelltite, Volclay Voltex SWR
Completed: October 2011
The Project
PROJECT REQUIREMENT
Casali features across the roof expanse of buildings 22 and 23, including in roof gutters on external balconies and beneath timber decking.
It is used in the landscaped area and external plant area and under parapets. More than 3500 square metres of Casali membrane was specified for the project along with tanking to lift pits in saline conditions.
ALLCO SOLUTION
Casali Dermabit Extra conforms to the highest European standards for enduring quality and latest non toxic membrane technology and is approved for the collection of rain water.
Casali’s international sales manager Antoine Melhem flew out from Italy to inspect the product upon completion. As the rain water from the roof and deck areas is to be collected and recycled, a membrane approved for water collection was required.
Voltex SWR membrane was used to tank all lift pits on this site, one of which was up to 6m deep and permanently below tidal level.